Installation work at at the plant in Dortmund is ongoing. The space is tight and time is short. Parts of the ventilation system are lifted to the rooftop. Parts of the ventilation system RV1-II are assembled on the top. This task was executed due to the condition on site – tight space and no space to place a heavy crane.